Abell - Barnaby Creek
#04-1056 #04-1056
Organization Upper Columbia Salmon Recovery Board Lead Entity
Sponsor Confederated Tribes of the Colville Reservation
Status Completed
Schedule Start Date: 6/16/2004 End Date: 2/9/2007
Category Category: Restoration
Project Photo
DESCRIPTION
The Abell culvert replacement project will eliminate a fish passage barrier on Barnaby Creek which lies on in the north eastern portion of the Colville Reservation. This action will provide approximately 17.5 miles of additional stream for fish access with 4.3 miles on the Reservation and the remainder on National Forest lands. Fish species that will benefit include rainbow, (redband and coastal) and eastern brook trout. The project will increase access for all life stages of these species. The project will replace a round 28 foot long by 90 inch diameter culvert with an appropriately sized bridge. At present the culvert has a two foot out fall drop which prevents passage. Because of topography only two alternative were feasible; bottomless culvert or bridge. Preliminary cost estimates indicated that bridging would result in achieving the projects goals for less money. The Fish and Wildlife Department of the Confederated Tribes of the Colville Reservation will be the lead entity for the project.
Show more  ↓
FUNDING SOURCES
FUNDING ENTRIES FROM GRANT PROJECT AGREEMENT
TypeDateFunding OrgFunding ProgramMatchAmount
Requested06/11/2004Confederated Tribes of the Colville ReservationMatch$5,000.00
Requested06/11/2004Recreation and Conservation Office (RCO)FFFPP Grants$63,560.00
Allocated02/09/2007Confederated Tribes of the Colville ReservationMatch$4,847.51
Allocated02/09/2007Recreation and Conservation Office (RCO)FFFPP Grants$121,145.11
Spent02/09/2007Confederated Tribes of the Colville ReservationMatch-$4,847.51
Spent02/09/2007Recreation and Conservation Office (RCO)FFFPP Grants-$121,145.11
Grant Project Agreement Totals Proposed Requested Allocated Spent Balance
$68,560.00 $68,560.00 $125,992.62 $125,992.62 $0.00
OTHER FUNDING (Funding that is NOT in a grant project agreement)
TypeDateFunding OrgFunding ProgramMatchAmount
Other Funding Totals Proposed Requested Allocated Spent Balance
Grand Totals Proposed Requested Allocated Spent Balance
PRIMARY SPONSOR
PROJECT CONTACT
PROJECT MANAGER
PHOTOS

 
LOCATION
Chinook-Pop (ESU):Chinook-Upper Columbia River Spring, Kettle River, Outside anadromous area
County:Ferry
HUC12:Barnaby Creek (170200011306)
HUC8:Franklin D. Roosevelt Lake (17020001)
Legislative District:07
Salmon Recovery Regions:Northeast Washington
Sections:09
Sections:15
Steelhead-Pop (ESU):Steelhead-Upper Columbia River, Kettle River, Outside anadromous area
Township:T34NR36E
Watershed Administrative Unit:Barnaby Creek
WRIA:Middle Lake Roosevelt
View project on a larger map
  APPLICATION FINAL 
RESTORATION METRICS
Miles of Stream and/or Shoreline Treated or Protected (C.0.b)
0.01mi0.01mi
Fish Passage Improvement    
*Miles Of Stream Made Accessible (SRFB) (C.2.b.1)
0.56mi0.56mi
*Number of blockages / impediments / barriers impeding passage (C.2.b.4)
1.00
Miles Of Stream Made Accessible (FFFPP)
7.20mi
Square Miles Of streambed made accessible (C.2.b.2)
 Bridge installed or improved (C.2.g.1)    
Miles of stream made accessible by bridge installation/repair (C.2.g.3)
0.56mi
Number of bridges (C.2.g.2)
1.00
 Culvert installed or improved (C.2.f.1)    
Miles of stream made accessible by culvert installation/repair (C.2.f.3)
0.56mi
Number of culverts (C.2.f.2)
 Fish passage blockages removed or altered (C.2.c.1)    
Number of Blockages/Impediments/Barriers Removed/Altered (C.2.c.2)
1.001.00
 Road-crossing removal (C.2.i.1)    
Miles of stream made accessible by road crossing removal (C.2.i.3)
0.00mi0.00mi
Number of road-crossings (C.2.i.2)