CCT Okanogan River Restoration Initative (ORRI) Phase I & II
#SRP-01-13256 #SRP-01-13256
 Okanogan Sub-basin Canada Main Stem and Tributaries CCT Okanogan River Restoration Initative (ORRI) Phase I & II
Organization Upper Columbia Salmon Recovery Board Lead Entity
Sponsor Confederated Tribes of the Colville Reservation
Status Completed
Schedule Start Date: 1/1/2001 End Date: 12/1/2013
Category Category: Restoration
Project Photo
DESCRIPTION
Phase II of the ORRI project will be designed with BPA funds and then implemented by a Upper Columbia PUD funding source. The Canadian portion of the Okanogan River has been heavily diked for flood control. Already part of the dike has been set back for the benefit of spawning salmonids (Phase 1).

The Canadian portion of the Okanogan River has been heavily diked for flood control. Already part of the dike has been set back for the benefit of spawning salmonids. The second phase of the dike set back will be designed and then implemented by Upper Columbia PUD funding. The Okanagan River Restoration Project (ORRI) is located on the mainstem of the Okanagan River in British Columbia approximately 10 miles upstream from Osoyoos Lake. Two properties totaling 1087 meters in length were purchased specifically for this project and are located on the west bank of the river adjacent to the northern boundary of the Town of Oliver BC. This phase of ORRI (Phase IV) will include dyke set back restoring river meanders and creation of pool/riffle sequences. On the re-established floodplain riparian vegetation will be restored. The creation of complex and diverse natural habitat will provide high quality spawning habitat for all species and rearing for steelhead and possibly Chinook. Reconnection with the floodplain is intended to decrease silt loads in the main channel. Egg to fry survival is expected to increase and rearing sites will be established where there are presently none. The project is designed to be self-sustaining and ecosystem based.
Show more  ↓
FUNDING SOURCES
FUNDING ENTRIES FROM GRANT PROJECT AGREEMENT
TypeDateFunding OrgFunding ProgramMatchAmount
Allocated01/01/2001Bonneville Power Administration (BPA)$366,666.00
Allocated01/01/2001Grant County Public Utility DistrictPriest Rapids Coordinating Committee$366,666.00
Allocated01/01/2001Chelan County Public Utilities DistrictRocky Reach HCP Tributary Fund$366,666.00
Spent01/10/2009Bonneville Power Administration (BPA)-$366,666.00
Spent06/05/2023Grant County Public Utility DistrictPriest Rapids Coordinating Committee-$366,666.00
Spent06/05/2023Chelan County Public Utilities DistrictRocky Reach HCP Tributary Fund-$366,666.00
Grant Project Agreement Totals Proposed Requested Allocated Spent Balance
$1,100,000.00 $0.00 $1,099,998.00 $1,099,998.00 $0.00
OTHER FUNDING (Funding that is NOT in a grant project agreement)
TypeDateFunding OrgFunding ProgramMatchAmount
Other Funding Totals Proposed Requested Allocated Spent Balance
Grand Totals Proposed Requested Allocated Spent Balance
PRIMARY SPONSOR
PROJECT CONTACT
ALT PROJECT CONTACT
PHOTOS

 
LOCATION
Chinook-Pop (ESU):Chinook-Upper Columbia River Spring, Okanogan River, Outside anadromous area
HUC12:Testalinden Creek-Okanagan River (170200061406)
HUC8:Okanogan (17020006)
Steelhead-Pop (ESU):Steelhead-Upper Columbia River, Okanogan River, Threatened